DHS 159.34(8)(f)
(f) Asbestos training, certification, provisional certification, and notification requirements and responsibilities under this chapter, including procedures for submitting certification applications and project notifications, and required fees.
DHS 159.34(8)(g)
(g) Department of safety and professional services asbestos regulations for public sector employees under
ch. SPS 332.
DHS 159.34(8)(h)
(h) Department of natural resources regulations for the control of asbestos emissions under
ch. NR 447.
DHS 159.34(9)
(9) Record keeping. Recordkeeping for the management planner, including all of the following:
DHS 159.34(9)(a)
(a) Use of field inspector's data sheet along with laboratory results.
DHS 159.34(9)(b)
(b) On-going recordkeeping as a means to track asbestos disturbance.
DHS 159.34(10)
(10) Management plan. Assembling and submitting the management plan, including all of the following:
DHS 159.34(10)(a)
(a) Plan requirements for schools under section 203 (i) (1) of Title II of the Toxic Substance Control Act (15 U.S.C. sec. 2643).
DHS 159.34(10)(c)
(c) Hands-on skills training and practice to include the following:
DHS 159.34(11)
(11) Financing. Financing abatement actions, including all of the following:
DHS 159.34(11)(c)
(c) Present cost of abatement versus future operations and maintenance costs.
DHS 159.34 History
History: CR 08-036: cr.
Register February 2009 No. 638, eff. 5-1-09; correction in (8) (g) made under s.
13.92 (4) (b) 6.,
7., Stats.,
Register January 2012 No. 673.
DHS 159.35
DHS 159.35 Curriculum requirements for asbestos project designer initial course. The initial training course for the asbestos project designer discipline shall be 3 training days in length. Course instruction shall include lecture supplemented by audiovisual materials; learning exercises and activities; at least 2 hours of hands-on skills training and practice; demonstrations; a field trip; course review with time to answer questions; a written course test that meets requirements under
s. DHS 159.22 (16); and time to assist students to complete the department application for certification. Course instruction for the asbestos project designer initial training course shall address all of the following:
DHS 159.35(1)
(1) Asbestos characteristics. Physical characteristics of asbestos, including all of the following:
DHS 159.35(2)
(2) Health effects. Potential health effects related to asbestos exposure, including all of the following:
DHS 159.35(2)(c)
(c) Dose-response relationship and the lack of a safe exposure level.
DHS 159.35(2)(d)
(d) Synergistic effect between cigarette smoking and asbestos exposure.
DHS 159.35(2)(f)
(f) Relationship of asbestos exposure to asbestosis, lung cancer, mesothelioma, and cancers of other organs.
DHS 159.35(3)
(3) Abatement construction projects. Overview of abatement projects including the following:
DHS 159.35(4)
(4) Safety design for abatement. Safety system design specifications, including all of the following:
DHS 159.35(4)(b)
(b) Isolating the work area, preparation and set-up, including:
DHS 159.35(4)(b)1.
1. Design, construction and maintenance of barriers, containments, and decontamination enclosure systems.
DHS 159.35(4)(c)
(c) Proper abatement work techniques to minimize fiber release, including:
DHS 159.35(4)(c)6.
6. Encapsulation, enclosure, and repair of asbestos-containing material.
DHS 159.35(4)(d)
(d) Proper worksite cleanup, waste handling and decontamination, including:
DHS 159.35(5)
(5) Field trip. Field trip to an abatement site or other suitable building site, including all of the following:
DHS 159.35(5)(c)
(c) Discussion of the rationale for functional spaces during the walk-through.
DHS 159.35(6)
(6) Personal protective equipment. The use of personal protective equipment, including all of the following:
DHS 159.35(6)(a)
(a) Classes and characteristics of respirators, including respirator protection factors.
DHS 159.35(6)(c)
(c) Proper respirator selection, inspection, donning, use, maintenance, and storage procedures.
DHS 159.35(6)(e)
(e) Methods for field testing of the facepiece-to-face seal, including positive and negative pressure fit checks.
DHS 159.35(6)(g)
(g) Variability between field and laboratory protection and factors that alter respirator fit, such as facial hair.
DHS 159.35(6)(h)
(h) Components of a proper respiratory protection program and employer responsibilities.
DHS 159.35(6)(i)
(i) Selection and use of disposable and non-disposable personal protective clothing.
DHS 159.35(7)
(7) Other safety hazards. Additional safety hazards encountered during abatement activities and how to deal with them, including all of the following:
DHS 159.35(8)
(8) Controlling airborne asbestos fibers. Fiber aerodynamics and control, including all of the following:
DHS 159.35(8)(f)
(f) Aggressive air movement and negative pressure exhaust ventilation as a clean-up method.